top of page

Dock Leveller Inspection

dock leveler in new warehouse.jpg
Technical Loadarm’s dock plate inspection process combines several of the major OEM’s inspection criteria. 

Our process includes, but is not limited to, the operational check of the unit.  Elements condition, toe guards, hinge and hinge weldments are all part of the safety certification.  Please call us for further details.

© 1986 by Technical Loadarm. 

  • Instagram
  • Facebook
  • Linkedin
bottom of page